banner (1)

1/4-20 Machine Screw - China Manufacturer | High-Quality Fasteners

As a China Manufacturer, I ship dependable 1/4-20 machine screw for assembly lines and OEMs worldwide. Customers choose me because I combine reliable performance with flexible customization. Made from carbon steel with zinc plating or 304 stainless, these screws feature a 1/4-20 thread, universal hex socket or slotted head, and tight tolerances per DIN/ANSI standards. I offer lengths from 1/2" to 6" and can supply pre-lubricated options or corrosion-resistant finishes. In my factory, quality is checked at every step—material certification, dimensional inspection, and lot traceability—so you can count on consistent torque and pull-out resistance. I understand B2B buyers care about lead times, packaging, and bulk pricing, so I provide competitive quotes, ready-to-ship packaging, and drop-in compatibility with standard panels and brackets. Talk to me about your specs, whether you need standard stock or custom batch runs; I’m ready to meet your production schedules with fast, reliable delivery of 1/4-20 machine screw, matching the {} company detail.

Hot Selling Product

1/4-20 machine screw Factory Supplies the World\u2019s Top Brands

Global buyers rely on standardized 1/4-20 machine screws to keep production lines moving. The UNC thread size is widely stocked, compatible with a vast range of nuts and tapped holes, and supports rapid prototyping as well as large‑volume assemblies. To choose a reliable supplier, focus on material options (carbon steel, stainless steel), finishes (zinc plating, black oxide, passivation), and head styles (pan, hex socket, button) that match your design. A strong partner will provide traceable quality records and scalable capacity to meet evolving demand. To streamline procurement, specify exact length, thread engagement, driving type, finish, and tolerance. Request samples and ask for part traceability, coating thickness data, and finished part dimensional reports. Plan for lead times, minimum orders, and packaging that suits your logistics. With consistent quality, transparent lead times, and dependable worldwide shipping, you can reduce risk and accelerate time-to-market across diverse programs.

{ 1/4-20 machine screw Factory Supplies the World’s Top Brands}

Screw Type Thread Size Length (in) Material Finish Head Style Drive Type Grade/Property Tensile Strength (MPa) Hardness (HRC) Standard Notes
Socket Head Cap Screw 1/4-20 UNC 0.50 A2-70 Stainless Steel Passivated Socket Head Cap Hex A2-70 520-700 28-34 ANSI/ASME B18.3 Corrosion resistant for assemblies
Pan Head Machine Screw 1/4-20 UNC 0.75 1018 Carbon Steel Zinc-Plated Pan Head Phillips Grade 2 460-620 15-22 ANSI/ASME B18.6.3 General-purpose fastener
Button Head Socket Screw 1/4-20 UNC 1.00 A2-70 Stainless Steel Passivated Button Head Hex Socket A2-70 520-700 28-34 ANSI/ASME B18.6.3 Low-profile aesthetic
Flat Head Machine Screw 1/4-20 UNC 1.50 Cold Rolled Steel Zinc Yellow Flat Head Slotted Grade 5 480-640 18-22 ANSI/ASME B18.6.3 Flush-mount variant for countersunk holes
Security Head Machine Screw 1/4-20 UNC 2.00 A2-70 Stainless Steel Passivated Security Head Torx A2-70 520-700 28-34 ANSI/ASME B18.6.3 Tamper-resistant drive

Related Products

banner (3)

1/4-20 machine screw Service Backed by Expertise From Concept to Delivery

Data Dimension: Concept-to-Delivery Cycle Time (Days) Across Months

New Title: Concept-to-Delivery Cycle Time for Precision Screws

This chart presents the monthly lead time, measured in days, for the end-to-end lifecycle of a 1/4-20 machine screw from concept through design, tooling, machining, assembly, QA, packaging, and delivery. The data dimension is Cycle Time, which reflects how quickly a project can move from initial specification to the customer’s hands under a steady production system. The values shown illustrate how process improvements, standardized tooling, and proactive design-for-manufacturing practices can reduce cycle time over time. In this example, lead times begin near nine days in January and progressively shorten to just under five days by December, indicating ramp-up efficiency, better capacity planning, and more reliable supplier schedules. The line chart emphasizes the importance of early-stage engineering support and cross-functional collaboration, since design decisions and fixture readiness directly impact downstream throughput. A shorter cycle time typically correlates with higher overall order velocity and improved on-time delivery performance, which is critical for customers relying on just-in-time manufacturing or tight production calendars. This dataset demonstrates how continuous improvement efforts — such as pre-approved bill-of-materials, modular tooling, and standardized machining setups — can yield consistent reductions in lead time while maintaining product quality. External factors like supplier lead times, equipment maintenance, and quality inspections can cause fluctuations; these should be monitored alongside cycle time to isolate root causes. The 3:1 aspect ratio of the chart offers a clear, uncluttered view of month-to-month changes, enabling stakeholders to identify seasonal patterns or abrupt shifts. While cycle time is a single metric, pairing it with metrics like defect rate and fill rate provides a more complete picture of overall performance. For the precision screws market, close alignment across design, supply chain, and manufacturing is essential to sustain short, dependable delivery cycles that meet customer expectations and engineering tolerances.

Top Selling Products